free hydro mcqs

Hydrology & Irrigation| MCQ – 07 | 20 MCQs

Posted on April 21, 2022March 17, 2023 By Civil Vedant

Q.1) Hydrograph is the graphical representation of :

A) Runoff and time

B) Surface runoff and time

C) Ground water flow and time

D) Rainfall and time

Answer

Option (A)

Q.2) If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be :

A) Equal to rate of rainfall

B) Equal to infiltration capacity

C) More than rate of rainfall

D) More than infiltration capacity

Answer

Option (B)

Q.3) Under the same conditions, which of the following shapes of water surface will give the highest rate of evaporation?

A) Flat water surface

B) Convex water surface

C) Concave water surface

D) Independent of shape of water surface

Answer

Option (B)

Q.4) The best unit duration of storm for a unit hydrograph is :

A) 1 hour

B) One-fourth of basin lag

C) One-half of basin lag

D) Equal to basin lag

Answer

Option (B)

Q.5) If 4-hour unit hydrographs are staggered by 4 hours and added graphically, the resulting hydrograph will be :

A) 4-hour unit hydrograph

B) 4-hour hydrograph with 20 mm runoff

C) 8-hour unit hydrograph

D) 8-hour hydrograph with 20 mm runoff

Answer

Option (D)

Q.6) The major resisting force in a gravity dam is :

A) Water pressure

B) Wave pressure

C) Self-weight of dam

D) Uplift pressure

Answer

Option (C)

Q.7) Which of the following spillways is least suitable for an earthen dam?

A) Ogee spillway

B) Chute spillway

C) Side channel spillway

D) Shaft spillway

Answer

Option (A)

Q.8) The main function of a divide wall is to :

A) Control the silt entry in the canal

B) Prevent river floods from entering the canal

C) Separate the undersluices from weir proper

D) Provide smooth flow at sufficiently low velocity

Answer

Option (C)

Q.9) According to Lacey’s theory, the silt supporting eddies are generated from :

A) Bottom of channel only

B) Sides of channel only

C) Bottom as well as sides of channel

D) None of the above

Answer

Option (C)

Q.10) Which of the following canal outlets maintains a constant discharge?

A) Non-modular outlet

B) Flexible outlet

C) Rigid module

D) None of the above

Answer

Option (C)

Q.11) An aggrading river is a :

A) Silting river

B) Scouring river

C) Both silting and scouring river

D) Neither silting nor scouring river

Answer

Option (A)

Q.12) A repelling groyne is aligned :

A) Pointing upstream

B) Pointing downstream

C) Perpendicular to bank

D) Parallel to bank

Answer

Option (A)

Q.13) The net head under which the turbine reaches its peak efficiency at synchronous speed is called :

A) Design speed

B) Rated head

C) Gross head

D) Operating head

Answer

Option (A)

Q.14) In linear reservoir, storage varies linearly with :

A) Time

B) Inflow rate

C) Outflow rate

D) None of the above

Answer

Option (C)

Q.15) Discharge per unit drawdown at a well is called :

A) Specific storage

B) Specific yield

C) Specific capacity

D) None of the above

Answer

Option (C)

Q.16) Retrogression of downstream levels, generally considered in the design of weirs or barrages, is :

A) Higher at high flood stage than at low water levels

B) Same at high flood stage and at low water levels

C) Higher at water levels stage than at high flood stage

D) Independent of the stage of flow

Answer

Option (C)

Q.17) The probable maximum flood is :

A) The standard project flood of an extremely larger river

B) A flood adopted in the design of all kinds of spillways

C) A flood adopted in all hydraulic structures

D) An extremely large but physically possible flood in the region

Answer

Option (D)

Q.18) Conjuctive use of water in basin means :

A) Combined use of water for irrigation and for hydropower generation

B) Combined use of surface and ground water resources

C) Use of irrigation water for both rabi and kharif season

D) Use of irrigation water by cooperative of farmers

Answer

Option (B)

Q.19) Rigid boundary canals, whose bed and banks are made with non-erodible materials are in :

A) True regime

B) Permanent regime

C) Final regime

D) None of the above

Answer

Option (B)

Q.20) In a flow-mass curve study, the demand line drawn from a ridge does not intersect the mas curve again. This implies that :

A) The reservoir is not full at the beginning

B) The storage is not adequate

C) The demand cannot be met by the inflow as the reservoir will not refill

D) The reservoir is wasting water by spill

Answer

Option (C)

Share
Hydrology & Irrigation Tags:hydrology gate questions, hydrology is the study of, irrigation engineering, irrigation engineering mcq, irrigation mcq, irrigation mcq questions

Post navigation

Previous Post: Geotechnical Engineering | MCQ – 08 | 20 MCQs
Next Post: Damp Proofing Materials – Requirements & Types

More Related Articles

Hydrology & Irrigation | MCQ – 02 | 20 MCQs Hydrology & Irrigation
Hydrology & Irrigation| MCQ – 04 | 20 MCQs Hydrology & Irrigation
Hydrology & Irrigation | MCQ – 01 | 20 MCQs Hydrology & Irrigation
irrigation free mcqs Hydrology & Irrigation| MCQ – 06 | 20 MCQs Hydrology & Irrigation
irrigation free mcqs Hydrology & irrigation | MCQ – 09 | 20 MCQs Hydrology & Irrigation
hydrology mcqs Hydrology & Irrigation | MCQ – 08 | 20 MCQs Hydrology & Irrigation
  • Home
  • Disclaimer
  • Privacy Policy
  • Contact Us
  • About
  • DMCA

Copyright © CivilVedant. All Rights Reserved. All logos and trademarks belong to their respective owners.

Image by macrovector on Freepik

Copyright © 2023 Civil Vedant.

Powered by PressBook Blog WordPress theme