Skip to content
Civil Vedant

Civil Vedant

The Online Civil Engineering Portal

  • Articles
    • Materials & Construction
    • WRE & Irrigation
    • Geotechnical
    • Transportation
    • Environment
    • Safety
  • Multiple Choice Questions
    • Civil Engg.
    • Materials
    • Environment Engg.
    • Fluid Mechanics
    • Soil Mechanics
    • Structure
    • Survey
    • Hydrology & Irrigation
    • Transportation Engg.
  • Jobs
  • Toggle search form

Tag: AI in construction scheduling

From Design to Construction: The Many Ways AI is Making an Impact

Posted on January 22, 2023January 22, 2023 By Civil Vedant
From Design to Construction: The Many Ways AI is Making an Impact

The ability of a machine or computer system to perform tasks that would normally require human intelligence, such as visual perception, speech recognition, decision-making, and language translation, is referred to as artificial intelligence (AI).  There are two kinds of AI: narrow or weak AI, which is designed to perform a specific task, and general or…

Read More “From Design to Construction: The Many Ways AI is Making an Impact” »

Materials & Construction
  • Home
  • Disclaimer
  • Privacy Policy
  • Contact Us
  • About
  • DMCA

Copyright © CivilVedant. All Rights Reserved. All logos and trademarks belong to their respective owners.

Copyright © 2023 Civil Vedant.

Powered by PressBook Blog WordPress theme